St. Peter Wastewater Treatment Facility Biosolids Improvement Project CMAR Bid Packages
Description
Rice Lake Construction Group (RLCG), the Construction Manager at Risk (CMAR), is soliciting bids from M/W/DBE subcontractors and supplier firms for the following bid packages.
Project Summary: Conversion of the St. Peter WWTF biosolids process from lime pasteurization to heat drying and bagging. Scope includes belt filter press rebuilds, new feed pumps, cake conveyance, odor control, and tank aeration, a new thermal oil building, dry solids handling and bagging, and full mechanical, electrical, and controls. The plant stays in operation during construction, which makes sequencing and temporary solids handling critical.
BID PACKAGES:
• BP-01 General Construction
• BP-06 Plumbing
• BP-09 Process Mechanical
• BP-10 Process Equipment - Installation
Type of Businesses Being Solicited
- SBA certified Women-Owned Small Business (WOSB)
- Disadvantaged Business Enterprise (DBE) – Dept of Transportation
NAICS code
- 221320: Sewage Treatment Facilities