Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Description
Install two diversion structures across the full width of the 25’ concrete channel. Excavate 8-10 feet below the channel floor to form each structure (approx. 8’ x 25’). Install steel grates over structures. Provide wall-mounted steel gates. Install 4’ diameter discharge pipelines. Route piping across the gravel access road and basin slope. Construct concrete outlet structures in the basins for flow dissipation. Install piping along basin slopes. Provide all electrical, instrumentation, and SCADA controls integration.
Type of Businesses Being Solicited
- Small Business (SB)
- SBA certified Veteran Owned Small Business (VOSB)
- SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB)
- SBA certified Women-Owned Small Business (WOSB)
- SBA certified HUBZone Small Business (HUBZone SB)
- SAM.gov designated Small Disadvantaged Business (SDB)
- Disadvantaged Business Enterprise (DBE) – Dept of Transportation
NAICS code
- 237110: Water and Sewer Line and Related Structures Construction