Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Description
Seeking C-08, C-10, C-12, C-34, C-50, C-51 subcontractors. This project involves constructing two drop inlet diversion structures across the 25-foot-wide concrete San Antonio Creek Channel in Montclair, CA (I-10 to Moreno St.). Diversion Structures: Excavate 8–10 feet below the channel floor (approx. 8 ft × 25 ft per structure) across the full width, fit them with steel debris grates, and install wall-mounted steel gates on the east sides. Piping & Outlets: Install 4-foot-diameter discharge pipelines from each structure to Montclair Basins 2 and 3, routing across the access road and basin slopes (covered with 3 feet of soil). Build concrete outlet structures in the basins for flow dissipation. Controls & Integration: Provide complete electrical, instrumentation, and SCADA integration to actuate the gates, with programming restricted to approved integrators (Technical Systems, Inc. or E Technologies Group).
Type of Businesses Being Solicited
- Small Business (SB)
- SAM.gov designated Small Disadvantaged Business (SDB)
- SBA certified Women-Owned Small Business (WOSB)
- SBA certified HUBZone Small Business (HUBZone SB)
- SBA certified Veteran Owned Small Business (VOSB)
- SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB)
- Alaskan Native Corporation (ANC) or Indian Tribe (IT)
- Native Hawaiian Organization (NHO)
- Certified Disadvantaged Business Enterprise (DBE) – Dept of Transportation
- Disadvantaged Veteran Business Enterprise (DVBE) – State of California
- Minority Business Enterprise (MBE) – NMSDC certification (non-federal)
- Woman Business Enterprise (WBE) – WBENC certification (non-federal)
NAICS code
- 237110: Water and Sewer Line and Related Structures Construction